Skip to content
This repository has been archived by the owner on Jan 18, 2023. It is now read-only.

Latest commit

 

History

History
33 lines (17 loc) · 880 Bytes

Schedule.md

File metadata and controls

33 lines (17 loc) · 880 Bytes

Example Schedule for Converge

Intro to Day 3: Converge, guidelines (5min)

Pitch Practice (10min)

Revisit our risks (15min)

Recap Day 2, identify themes from our storyboards (30min)

Identify conflicts in our storyboards (30min)

Conflict: two or more ways of solving the same problem.

List the underlying assumptions (30min)

Create a table with two columns. One listing the assumptions embedded in our prototype and the other listing the ways in which we can test those assumptions.

Storyboard your prototype (2hrs)

Determine prototype medium (10min)

Plan interview questions (40min)

Make plans for reducing risks not addressed by the prototype (40min)

Consider plans for the week following the design sprint (30min)

Daily Recap (30min)

Consolidate notes and write daily summary.